CUSTOM APPAREL / OEM · ODM · PRIVATE LABEL

Blue, white, green and coral garments arranged on a clothing rail

BUILD YOUR RANGE

One garment. Or a collection.

Start with the product, then define the fit, fabric and details.

An apparel assortment arranged for different wearing activities

START WITH THE WEARER

Designed for the way it is worn.

Connect the garment mix to your customer, activity and order.

White sample garment on a dress form beside fabric swatches

FROM REFERENCE TO SAMPLE

Make the details yours.

Bring your references, materials and brand decisions into one brief.

Burgundy fabric, cut panels and a finished shirt showing garment production stages

CONNECT EACH STAGE

From material to finished garment.

Understand the decisions, checks and handoffs behind your order.

Garment references and material samples arranged for an apparel brief

MAKE INFORMED DECISIONS

A clearer brief. A better conversation.

Work through materials, specifications and the questions still open.

Apparel development references, garments and material choices

NINGHOW APPAREL

Bring your next apparel project.

Explore our service scope and discuss the support your project needs.

NINGHOW APPAREL / RESOURCES

Understand what sets the minimum—and when the clock starts.

An apparel MOQ or delivery estimate only becomes useful when its basis is clear. Compare style, material and customization requirements before comparing quantities or dates with Ninghow Apparel.

Blue shirts, white T-shirts, green sweatshirts and grey hoodies displayed with fabrics and trims.

STYLE → MATERIAL → CUSTOMIZATION

A collection total does not define every minimum.

MOQ is the minimum accepted quantity for a defined order basis. Ask whether it applies per style, color, fabric or coordinated program. Mixed styles and colors do not automatically share one minimum.

A silver zipper and white button beside grey, green, white and pale blue fabric swatches.

MATERIAL

Fabric and trim requirements

Custom colors, fabric runs, zippers, labels and other trims can have separate sourcing minimums. Confirm availability and acceptable alternatives.

ASSORTMENT

Style, color and size allocation

Pattern setup, construction and small or uneven runs affect the proposal. State quantities by style, color and size rather than one collection total.

CUSTOMIZATION

Decoration and presentation

Artwork setup, decoration positions and branded packaging introduce their own requirements. Confirm which minimums apply to garments and which apply to components.

PROJECT TYPE / QUESTIONS TO RESOLVE

Compare projects by the work they need.

Garments with different constructions need different preparation. A reference image alone cannot establish the minimum or schedule.

A colour-block hooded jacket and a white T-shirt laid back-side up beside garment sketches and fabric swatches.

DEVELOPMENT

New OEM or ODM garment

Clarify files, pattern work, materials, development ownership, revisions and approvals.

PRIVATE LABEL

An established garment direction

Confirm the base specification, branding, packaging and quantities; a familiar silhouette is not confirmation of stock.

PROMOTIONAL

An event or team order

Resolve artwork, wearer allocation and the arrival deadline together.

COLLECTION

Several coordinated styles

Check shared materials and separate style approvals before consolidating quantities.

REPEAT

A previously approved style

Reference the previous sample, then reconfirm current materials, changes and scheduling.

SAMPLE / PRODUCTION / DELIVERY

Keep three clocks separate.

Ask what starts and ends each estimate, and whether sourcing, revisions, inspection, packing, customs or transit are included.

Pattern drawing beside an unfinished white bodice and a finished green puff-sleeve top.

01

Sample development

Ready briefs, measurements, materials and artwork enable development. Fit or decoration revisions may change patterns, grading, sourcing and the next review date.

02

Bulk production

Confirm approved specifications and sample, quantities, material readiness and allocation. Cutting, sewing, decoration, finishing, checks and packing follow the agreed route.

03

Shipment and arrival

Freight follows packing and release. Transit, customs and destination handling require a separate allowance.

TRADE-OFFS / CONFIRMATION

What changes when quantity falls or the deadline moves?

QUANTITY

Smaller runs still need preparation

Setup costs spread across fewer units. Additional colors, decoration locations, custom trims or packaging can affect price and availability.

SCHEDULE

A shorter window leaves less review time

Incomplete artwork, late fit changes, split deliveries or new packing instructions can disrupt the plan. Identify sourcing, inspection and corrective-action time before accepting a deadline.

SEND / CHECK / CONFIRM

Turn assumptions into a written order basis.

Folded garments, a fabric swatch book and polo drawings beside a blank grid form and pen.

A preliminary target date is useful; label it as a requirement, then review feasibility against the open decisions.

BRIEF

Provide the current project status

Send styles, reference files, measurements, fit, materials, colors, decoration, trims, packaging and quantities. State sample approval and revision status.

COST

Confirm the minimum and charges

Record the qualifying construction, quantity basis, sample charges, revisions and shipping inclusions. Confirm material assumptions and change conditions for repeat orders.

ACCEPTANCE

Agree checks before scheduling

Define inspection scope, tolerances, acceptance criteria, any AQL or third-party inspection, and label or packaging approvals.

DELIVERY

Include the complete delivery requirement

Confirm destination, freight preference, target arrival, Incoterms, restrictions and stage start/end points in the written proposal.

YOUR NEXT STEP

Ask for an estimate with a defined basis.

Share the style breakdown, material and sample status, quantities, customization and destination. Identify the date you need and the decisions still open.

Request a quote

Allowed: pdf, jpg, jpeg, png, webp, doc, docx, xls, xlsx